Works matching IS 2964903X AND DT 2023 AND VI 2 AND IP 8
Results: 5
ANALYSIS OF THE NEEDS OF TYPE A TERMINAL INFRASTRUCTURE FACILITIES IN ARJOSARI, MALANG BASED ON DISASTER MITIGATION.
- Published in:
- Journal of Economics, Technology & Business / Jurnal Ekonomi Teknologi & Bisnis (JETBIS), 2023, v. 2, n. 8, p. 571
- By:
- Publication type:
- Article
RISK AND COST ANALYSIS STUDY OCCUPATIONAL HEALTH AND SAFETY (K3) ON PASSENGER TERMINAL BUILDING WORKS NEW MENTAWAI AIRPORT DEVELOPMENT PROJECT.
- Published in:
- Journal of Economics, Technology & Business / Jurnal Ekonomi Teknologi & Bisnis (JETBIS), 2023, v. 2, n. 8, p. 590
- By:
- Publication type:
- Article
ANALYSIS OF FACTORS AFFECTING THE EFFECTIVENESS OF HANDLING OVER-DIMENSION AND OVERLOADING (ODOL) IN EAST JAVA AT UPPKB TROSOBO SIDOARJO AND UPPKB SINGOSARI MALANG.
- Published in:
- Journal of Economics, Technology & Business / Jurnal Ekonomi Teknologi & Bisnis (JETBIS), 2023, v. 2, n. 8, p. 540
- By:
- Publication type:
- Article
VALUE ENGINEERING ANALYSIS ON THE ARCHITECTURAL WORK OF THE ARJOSARI MALANG TYPE A TERMINAL REVITALIZATION PROJECT.
- Published in:
- Journal of Economics, Technology & Business / Jurnal Ekonomi Teknologi & Bisnis (JETBIS), 2023, v. 2, n. 8, p. 556
- By:
- Publication type:
- Article
ANALYSIS OF ELECTRICAL ENERGY EFFICIENCY USING ALBEDO AND OVERALL THERMAL TRANSFER VALUE METHODS IN THE CONCEPT OF GREEN BUILDING.
- Published in:
- Journal of Economics, Technology & Business / Jurnal Ekonomi Teknologi & Bisnis (JETBIS), 2023, v. 2, n. 8, p. 528
- By:
- Publication type:
- Article