Works matching IS 25726668 AND DT 2024 AND VI 133 AND IP 4
Results: 6
Strip mining in thick overburden context: A review.
- Published in:
- Mining Technology (2572-6668), 2024, v. 133, n. 4, p. 291, doi. 10.1177/25726668241289045
- By:
- Publication type:
- Article
An analytical approach for evaluation of conveyor exit strategies in open-pit mines.
- Published in:
- Mining Technology (2572-6668), 2024, v. 133, n. 4, p. 305, doi. 10.1177/25726668241289040
- By:
- Publication type:
- Article
Reduction of production delay cost in underground coal mines: An FMEA-based method study approach.
- Published in:
- Mining Technology (2572-6668), 2024, v. 133, n. 4, p. 319, doi. 10.1177/25726668241287601
- By:
- Publication type:
- Article
The future of underground mine planning in the era of machine learning: Opportunities for engineering robustness and flexibility.
- Published in:
- Mining Technology (2572-6668), 2024, v. 133, n. 4, p. 331, doi. 10.1177/25726668241281875
- By:
- Publication type:
- Article
Implementing Gaussian process modelling in predictive maintenance of mining machineries.
- Published in:
- Mining Technology (2572-6668), 2024, v. 133, n. 4, p. 348, doi. 10.1177/25726668241275434
- By:
- Publication type:
- Article
Grade control drillhole spacing and mining selectivity determination using high resolution simulations applied on distinctly heterogeneous open pit mines.
- Published in:
- Mining Technology (2572-6668), 2024, v. 133, n. 4, p. 369, doi. 10.1177/25726668241270400
- By:
- Publication type:
- Article