Works matching IS 23147229 AND DT 2021 AND VI 2 AND IP 2
Results: 4
The impact of stakeholder management on reducing time and cost in the implementation stages of mega projects.
- Published in:
- Future Engineering Journal, 2021, v. 2, n. 2, p. 1, doi. 10.54623/fue.fej.2.2.3
- By:
- Publication type:
- Article
Gap Study for the Impact of Braced Deep Excavation on the Behavior of Excavation Bed.
- Published in:
- Future Engineering Journal, 2021, v. 2, n. 2, p. 1, doi. 10.54623/fue.fej.2.2.2
- By:
- Publication type:
- Article
Application of using fault detection techniques in different components in power systems.
- Published in:
- Future Engineering Journal, 2021, v. 2, n. 2, p. 1
- By:
- Publication type:
- Article
A Survey on Various Image Inpainting Techniques.
- Published in:
- Future Engineering Journal, 2021, v. 2, n. 2, p. 1, doi. 10.54623/fue.fej.2.2.1
- By:
- Publication type:
- Article