Works matching IS 22311068 AND DT 2024 AND VI 14 AND IP 3
Results: 5
FASL FACTOR ANALYSIS OF TIME AND COST OVERRUNS IN CONSTRUCTION OF IRRIGATION PROJECTS.
- Published in:
- i-Manager's Journal on Civil Engineering, 2024, v. 14, n. 3, p. 1, doi. 10.26634/jce.14.3.21161
- By:
- Publication type:
- Article
ANALYSIS, DESIGN AND PARAMETRIC STUDY OF RCC BOX CULVERT USING STAAD.PRO.
- Published in:
- i-Manager's Journal on Civil Engineering, 2024, v. 14, n. 3, p. 51, doi. 10.26634/jce.14.3.21095
- By:
- Publication type:
- Article
EFFICIENT USE OF MANUFACTURED SAND AND MINERAL ADMIXTURES IN HIGH-STRENGTH CONCRETE.
- Published in:
- i-Manager's Journal on Civil Engineering, 2024, v. 14, n. 3, p. 36, doi. 10.26634/jce.14.3.21340
- By:
- Publication type:
- Article
CONSTRUCTION OF LIGHTWEIGHT BRICKS USING COCONUT LEAF ASH AND BUILDING BY-PRODUCTS.
- Published in:
- i-Manager's Journal on Civil Engineering, 2024, v. 14, n. 3, p. 45, doi. 10.26634/jce.14.3.21466
- By:
- Publication type:
- Article
STUDY ON THE OPTIMAL SPAN-TO-DEPTH RATIO FOR TWO-SPAN POST-TENSIONED PRESTRESSED CONCRETE BOX GIRDER BRIDGES.
- Published in:
- i-Manager's Journal on Civil Engineering, 2024, v. 14, n. 3, p. 25, doi. 10.26634/jce.14.3.21106
- By:
- Publication type:
- Article