Works matching IS 21554153 AND DT 2016 AND VI 3 AND IP 2
Results: 4
Rescheduling Activities in Face of Disruption in House Hold Goods Manufacturing Supply Chain.
- Published in:
- International Journal of Applied Industrial Engineering, 2016, v. 3, n. 2, p. 47, doi. 10.4018/IJAIE.2016070104
- By:
- Publication type:
- Article
A Literature Review of Musculoskeletal Disorders in Handicraft Sector.
- Published in:
- International Journal of Applied Industrial Engineering, 2016, v. 3, n. 2, p. 36, doi. 10.4018/IJAIE.2016070103
- By:
- Publication type:
- Article
Fuzzy Optimal Approaches to 2-P Cooperative Games.
- Published in:
- International Journal of Applied Industrial Engineering, 2016, v. 3, n. 2, p. 22, doi. 10.4018/IJAIE.2016070102
- By:
- Publication type:
- Article
Application of Hybrid Firefly Algorithm-Tabu Search Technique to Minimize the Makespan in Job Shop Scheduling problem.
- Published in:
- International Journal of Applied Industrial Engineering, 2016, v. 3, n. 2, p. 1, doi. 10.4018/IJAIE.2016070101
- By:
- Publication type:
- Article