Works matching IS 20965052 AND DT 2024 AND VI 6 AND IP 4
1
- Hazard Control in Tunnelling & Underground Engineering, 2024, v. 6, n. 4, p. 38, doi. 10.19952/j.cnki.2096-5052.2024.04.05
- 刘建兵;
- 杨志勇;
- 饶李;
- 王树英;
- 方克军;
- 王卓;
- 杨泽斌
- Article
2
- Hazard Control in Tunnelling & Underground Engineering, 2024, v. 6, n. 4, p. 27, doi. 10.19952/j.cnki.2096-5052.2024.04.04
- Article
3
- Hazard Control in Tunnelling & Underground Engineering, 2024, v. 6, n. 4, p. 90, doi. 10.19952/j.cnki.2096-5052.2024.04.10
- Article
4
- Hazard Control in Tunnelling & Underground Engineering, 2024, v. 6, n. 4, p. 81, doi. 10.19952/j.cnki.2096-5052.2024.04.09
- Article
5
- Hazard Control in Tunnelling & Underground Engineering, 2024, v. 6, n. 4, p. 72, doi. 10.19952/j.cnki.2096-5052.2024.04.08
- Article
6
- Hazard Control in Tunnelling & Underground Engineering, 2024, v. 6, n. 4, p. 50, doi. 10.19952/j.cnki.2096-5052.2024.04.06
- Article
7
- Hazard Control in Tunnelling & Underground Engineering, 2024, v. 6, n. 4, p. 20, doi. 10.19952/j.cnki.2096-5052.2024.04.03
- Article
8
- Hazard Control in Tunnelling & Underground Engineering, 2024, v. 6, n. 4, p. 12, doi. 10.19952/j.cnki.2096-5052.2024.04.02
- Article
9
- Hazard Control in Tunnelling & Underground Engineering, 2024, v. 6, n. 4, p. 1, doi. 10.19952/j.cnki.2096-5052.2024.04.01
- Article