Works matching IS 20964498 AND DT 2024 AND VI 44 AND IP 3


Results: 18
    1
    2
    3
    4
    5
    6
    7
    8

    沉井侧摩阻力监测装置设计及应用研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2024, v. 44, n. 3, p. 535, doi. 10.3973/j.issn.2096-4498.2024.03.011
    By:
    • 肖 靖;
    • 曾旭涛;
    • 李嘉成;
    • 陈培帅;
    • 李德杰
    Publication type:
    Article
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18