Works matching IS 20964498 AND DT 2023 AND VI 43 AND IP 11
Results: 16
一种控制隧道排水系统结晶堵塞的新型除垢剂研发与性能研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1973, doi. 10.3973/j.issn.2096-4498.2023.11.017
- By:
- Publication type:
- Article
敞开式掘进机洞内检修改造方案及费用分析 --以引汉济渭秦岭输水隧洞岭北TBM 设备检修改造为例
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1964, doi. 10.3973/j.issn.2096-4498.2023.11.016
- By:
- Publication type:
- Article
深中通道沉管隧道深层水泥搅拌桩复合地基合理布置形式研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1944, doi. 10.3973/j.issn.2096-4498.2023.11.014
- By:
- Publication type:
- Article
地震多发区山岭隧道新型隔震结构设计与应用研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1935, doi. 10.3973/j.issn.2096-4498.2023.11.013
- By:
- Publication type:
- Article
破碎软岩斜井TBM 开挖围岩稳定性及支护优化研究 --以可可盖副斜井TBM 掘进工程为例
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1924, doi. 10.3973/j.issn.2096-4498.2023.11.012
- By:
- Publication type:
- Article
高地应力软岩隧道预留变形量设计方法.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1916, doi. 10.3973/j.issn.2096-4498.2023.11.011
- By:
- Publication type:
- Article
深埋长隧道纵剖面初始地应力插值计算方法及应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1908, doi. 10.3973/j.issn.2096-4498.2023.11.010
- By:
- Publication type:
- Article
厦门第二东通道现浇隧道结构托换运营BRT 桥桩受力体系转换研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1896, doi. 10.3973/j.issn.2096-4498.2023.11.009
- By:
- Publication type:
- Article
吸收式制冷系统应用于高温热害隧道降温的理论分析研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1887, doi. 10.3973/j.issn.2096-4498.2023.11.008
- By:
- Publication type:
- Article
盾构自动驾驶性能评价体系设计和应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1872, doi. 10.3973/j.issn.2096-4498.2023.11.007
- By:
- Publication type:
- Article
基于非线性模糊层次分析法的盾构施工风险评价研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1862, doi. 10.3973/j.issn.2096-4498.2023.11.006
- By:
- Publication type:
- Article
改进CNN 在TBM 变速箱磨损状态识别中的应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1853, doi. 10.3973/j.issn.2096-4498.2023.11.005
- By:
- Publication type:
- Article
盾构弃渣在岩溶充填注浆材料中的资源化利用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1842, doi. 10.3973/j.issn.2096-4498.2023.11.004
- By:
- Publication type:
- Article
强降雨条件下管道型隐伏溶洞对隧道衬砌结构影响研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1831, doi. 10.3973/j.issn.2096-4498.2023.11.003
- By:
- Publication type:
- Article
明挖隧道衬砌结构拆模时间研究及可靠度分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1821, doi. 10.3973/j.issn.2096-4498.2023.11.002
- By:
- Publication type:
- Article
我国抽水蓄能电站隧洞开挖机械化施工发展现状及展望.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2023, v. 43, n. 11, p. 1811, doi. 10.3973/j.issn.2096-4498.2023.11.001
- By:
- Publication type:
- Article