Works matching IS 20964498 AND DT 2022 AND VI 42 AND IP 1


Results: 19
    1
    2
    3
    4
    5
    6
    7

    盾构水平姿态的理论分析模型.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2022, v. 42, n. 1, p. 83, doi. 10.3973/j.issn.2096-4498.2022.01.011
    By:
    • 黄 威;
    • 任 梦;
    • ,陈培帅;
    • 罗会武
    Publication type:
    Article
    8
    9
    10
    11
    12
    13
    14
    15
    16

    基于LSTM算法的基坑变形预测.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2022, v. 42, n. 1, p. 113, doi. 10.3973/j.issn.2096-4498.2022.01.014
    By:
    • 张生杰;
    • 谭 勇
    Publication type:
    Article
    17
    18
    19

    高地温尼格隧道综合降温体系研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2022, v. 42, n. 1, p. 16, doi. 10.3973/j.issn.2096-4498.2022.01.003
    By:
    • 王志杰;
    • 姜逸帆;
    • 林 铭;
    • 邓宇航;
    • 刘新星;
    • 魏子棋;
    • 周 平
    Publication type:
    Article