Works matching IS 20964498 AND DT 2021 AND VI 41 AND IP 9


Results: 21
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11

    隧道钢拱节点让压性能分析.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1524, doi. 10.3973/j.issn.2096-4498.2021.09.011
    By:
    • 董 标;
    • 杨进京;
    • 殷洪波;
    • 徐国林
    Publication type:
    Article
    12
    13
    14

    公路隧道环境感知系统的设计与实现.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1502, doi. 10.3973/j.issn.2096-4498.2021.09.008
    By:
    • 钱 超;
    • 邓木生;
    • 李虎雄;
    • 陈建勋;
    • 王辰瑶
    Publication type:
    Article
    15
    16
    17
    18
    19
    20

    川藏铁路色季拉山隧道设计方案研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1451, doi. 10.3973/j.issn.2096-4498.2021.09.002
    By:
    • 李国良;
    • 向 亮;
    • 陈敬军;
    • 朵生君;
    • 刘国庆;
    • 陈绍华
    Publication type:
    Article
    21