Works matching IS 20964498 AND DT 2021 AND VI 41 AND IP 9
Results: 21
Three-Lane Super-Large Section Rectangular Pipe-Jacking Tunnel Underpassing Nanhu Avenue in Jiaxing, China.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1612
- By:
- Publication type:
- Article
隧道机电设备长期性能维修策略动态选择.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1604, doi. 10.3973/j.issn.2096-4498.2021.09.020
- By:
- Publication type:
- Article
深中通道工程超大型构件轮轨式台车移动系统设计与应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1594, doi. 10.3973/j.issn.2096-4498.2021.09.019
- By:
- Publication type:
- Article
大断面矩形顶管法地铁车站施工沉降控制技术实践———以上海轨道交通14 号线静安寺站工程为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1585, doi. 10.3973/j.issn.2096-4498.2021.09.018
- By:
- Publication type:
- Article
高瓦斯隧道非防爆无轨运输风险防控技术探讨与应用———以渝黔铁路天坪隧道工程为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1577, doi. 10.3973/j.issn.2096-4498.2021.09.017
- By:
- Publication type:
- Article
木寨岭公路隧道复合型大变形控制技术与实践.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1565, doi. 10.3973/j.issn.2096-4498.2021.09.016
- By:
- Publication type:
- Article
全断面岩石隧道掘进机( TBM) 施工超前处置技术综述与思考.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1555, doi. 10.3973/j.issn.2096-4498.2021.09.015
- By:
- Publication type:
- Article
单线重载铁路隧道复合式衬砌结构优化研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1547, doi. 10.3973/j.issn.2096-4498.2021.09.014
- By:
- Publication type:
- Article
集约型地下综合空间一体化设计实践———以西安西咸新区能源金贸区地下综合空间为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1538, doi. 10.3973/j.issn.2096-4498.2021.09.013
- By:
- Publication type:
- Article
SFRC 管片正截面设计方法适用性比较研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1530, doi. 10.3973/j.issn.2096-4498.2021.09.012
- By:
- Publication type:
- Article
隧道钢拱节点让压性能分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1524, doi. 10.3973/j.issn.2096-4498.2021.09.011
- By:
- Publication type:
- Article
隧道排水土工织物抗淤堵性能模型试验研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1516, doi. 10.3973/j.issn.2096-4498.2021.09.010
- By:
- Publication type:
- Article
磨料射流切割桩基钢筋性能试验研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1509, doi. 10.3973/j.issn.2096-4498.2021.09.009
- By:
- Publication type:
- Article
公路隧道环境感知系统的设计与实现.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1502, doi. 10.3973/j.issn.2096-4498.2021.09.008
- By:
- Publication type:
- Article
基于正交试验、FAHP-价值工程法的基坑工程回灌参数优选.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1492, doi. 10.3973/j.issn.2096-4498.2021.09.007
- By:
- Publication type:
- Article
复合地层土压平衡盾构斜穿地下连续墙推进力计算研究———以南宁市轨道交通5 号线新广区间盾构隧道工程为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1485, doi. 10.3973/j.issn.2096-4498.2021.09.006
- By:
- Publication type:
- Article
基于多因素耦合的高速公路隧道群定义探讨.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1478, doi. 10.3973/j.issn.2096-4498.2021.09.005
- By:
- Publication type:
- Article
基于能源桩的城市隧道路面融雪防结冰技术探究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1468, doi. 10.3973/j.issn.2096-4498.2021.09.004
- By:
- Publication type:
- Article
川藏铁路色季拉山隧道设计方案研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1451, doi. 10.3973/j.issn.2096-4498.2021.09.002
- By:
- Publication type:
- Article
Establishment and Application of "1 km+100 m+50 m" Geological Prediction System for Extra-Long TBM Tunnels: a Case Study on Water Supply Project Ⅱ in Xinjiang, China.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1433, doi. 10.3973/j.issn.2096-4498.2021.09.001
- By:
- Publication type:
- Article
特长隧道出入口驾驶员生理负荷与行车安全性研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 9, p. 1461, doi. 10.3973/j.issn.2096-4498.2021.09.003
- By:
- Publication type:
- Article