Works matching IS 20964498 AND DT 2021 AND VI 41 AND IP 5


Results: 24
    1
    2
    3
    4
    5
    6
    7
    8
    9

    暗挖综合管廊的发展和研究方向.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 764, doi. 10.3973/j.issn.2096-4498.2021.05.009
    By:
    • 强健
    Publication type:
    Article
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20

    TBM 掘进岩渣图像分割与识别方法研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 803, doi. 10.3973/j.issn.2096-4498.2021.05.014
    By:
    • 李青蔚;
    • 杜立杰;
    • 杨亚磊;
    • 刘雷涛;
    • 蔡龙;
    • 刘金辉
    Publication type:
    Article
    21
    22
    23
    24