Works matching IS 20964498 AND DT 2021 AND VI 41 AND IP 10
Results: 20
全断面竖井掘进机研制及关键系统试验.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1794, doi. 10.3973/j.issn.2096-4498.2021.10.019
- By:
- Publication type:
- Article
先导管盾构隧道 —水下隧道构筑新方法的构想.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1801, doi. 10.3973/j.issn.2096-4498.2021.10.020
- By:
- Publication type:
- Article
大断面类矩形顶管壳体土压及顶进阻力分析 ———以上海淞沪路—三门路下立交工程为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1740, doi. 10.3973/j.issn.2096-4498.2021.10.013
- By:
- Publication type:
- Article
郑万铁路巴东至香炉坪隧道群岩溶地质选线方案研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1771, doi. 10.3973/j.issn.2096-4498.2021.10.017.
- By:
- Publication type:
- Article
超大空间基坑中部既有建(构)筑物保护支护设计方案研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1765, doi. 10.3973/j.issn.2096-4498.2021.10.016
- By:
- Publication type:
- Article
隧道衬砌排水系统单元排水状态评价方法研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1756, doi. 10.3973/j.issn.2096-4498.2021.10.015
- By:
- Publication type:
- Article
考虑超前支护作用效应的围岩-支护相互作用机制研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1748, doi. 10.3973/j.issn.2096-4498.2021.10.014
- By:
- Publication type:
- Article
软土常压刀盘盘面开口及盘体结构优化设计研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1781, doi. 10.3973/j.issn.2096-4498.2021.10.018
- By:
- Publication type:
- Article
优化 GA-BP 神经网络模型及基坑变形预测.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1733, doi. 10.3973/j.issn.2096-4498.2021.10.012
- By:
- Publication type:
- Article
Research on Development Strategy of Tunnel and Underground Construction Technology and Equipment in China.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1717, doi. 10.3973/j.issn.2096-4498.2021.10.011
- By:
- Publication type:
- Article
基于极限分析的复合地层浅埋隧道掌子面上限支护压力研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1708, doi. 10.3973/j.issn.2096-4498.2021.10.010
- By:
- Publication type:
- Article
MJS 工法与高压旋喷桩(双重管)挤土效应对比试验研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1699, doi. 10.3973/j.issn.2096-4498.2021.10.009
- By:
- Publication type:
- Article
基于 PCBN 模型盾构下穿既有隧道施工安全风险评价.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1692, doi. 10.3973/j.issn.2096-4498.2021.10.008
- By:
- Publication type:
- Article
深中通道钢壳沉管自密实混凝土拌合物泵后性能评价 及预测模型研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1682, doi. 10.3973/j.issn.2096-4498.2021.10.007
- By:
- Publication type:
- Article
枝江尾矿库排水工程圆形顶管工作井后背墙及 土体的应力与位移特征分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1672, doi. 10.3973/j.issn.2096-4498.2021.10.006
- By:
- Publication type:
- Article
管片接缝密封垫接触面泄漏率的数值模拟研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1654, doi. 10.3973/j.issn.2096-4498.2021.10.004
- By:
- Publication type:
- Article
川藏铁路隧道高海拔环境钻爆法施工装备选型配置思考.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1644, doi. 10.3973/j.issn.2096-4498.2021.10.003
- By:
- Publication type:
- Article
Key Technologies for Controlling Large Deformation of Soft Rock Tunnels with High Geostress.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1634, doi. 10.3973/j.issn.2096-4498.2021.10.002
- By:
- Publication type:
- Article
高地应力软岩隧洞挤压型大变形的非线性流变属性 及采用让压支护的工程整治研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1627, doi. 10.3973/j.issn.2096-4498.2021.10.001
- By:
- Publication type:
- Article
基于 Hoek-Brown 准则的强度等效方法对比及应用研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 10, p. 1662, doi. 10.3973/j.issn.2096-4498.2021.10.005
- By:
- Publication type:
- Article