Works matching IS 20964498 AND DT 2019 AND VI 39 AND IP 9


Results: 25
    1
    2
    3
    4
    5
    6

    某隧洞工程TBM 不良地质处置探究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 9, p. 1515, doi. 10.3973/j.issn.2096-4498.2019.09.017
    By:
    • 刘飞香;
    • 于 洋
    Publication type:
    Article
    7
    8
    9
    10
    11
    12

    综合管廊的区间设计.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 9, p. 1480, doi. 10.3973/j.issn.2096-4498.2019.09.012
    By:
    • 强 健;
    • 王恒栋;
    • 祁 峰
    Publication type:
    Article
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25

    顶管法T 接隧道结构受力足尺试验研究.

    Published in:
    Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 9, p. 1392, doi. 10.3973/j.issn.2096-4498.2019.09.002
    By:
    • 朱瑶宏;
    • 高一民;
    • 董子博;
    • 柳 献
    Publication type:
    Article