Works matching IS 20964498 AND DT 2019 AND VI 39 AND IP 4
Results: 35
国内首次! 地铁盾构成功穿越运营中高铁隧道.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 693
- Publication type:
- Article
Key Technology of Overlength Pressure Tunnel in Water Supply Project in Central City of Jilin Province.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 684, doi. 10.3973/j.issn.2096-4498.2019.04.020
- By:
- Publication type:
- Article
吉林引松工程超长有压隧洞关键技术.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 684, doi. 10.3973/j.issn.2096-4498.2019.04.020
- By:
- Publication type:
- Article
中企承建的引水隧道贯通 系尼泊尔国家骄傲工程.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 660
- Publication type:
- Article
公路隧道施工成洞段LED 照明优化设计研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 651, doi. 10.3973/j.issn.2096-4498.2019.04.016
- By:
- Publication type:
- Article
挑战世界极寒 中国在欧洲的首个地铁工程获重大突破.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 600
- Publication type:
- Article
复合地层TBM 隧道施工引起建筑物沉降规律研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 594, doi. 10.3973/j.issn.2096-4498.2019.04.009
- By:
- Publication type:
- Article
装配式混凝土梁钢套筒锚接接头抗弯性能研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 556, doi. 10.3973/j.issn.2096-4498.2019.04.004
- By:
- Publication type:
- Article
铁路隧道智能化建造装备技术创新与施工协同管理展望.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 545, doi. 10.3973/j.issn.2096-4498.2019.04.003
- By:
- Publication type:
- Article
上软下硬复合地层盾构隧道设计施工难点及对策研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 669, doi. 10.3973/j.issn.2096-4498.2019.04.018
- By:
- Publication type:
- Article
中国城市轨道交通2018 年度数据统计.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 694
- Publication type:
- Article
地热利用型盾构法隧道施工探索 ---以清华园隧道能源管片设计、制作及安装为例
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 677, doi. 10.3973/j.issn.2096-4498.2019.04.019
- By:
- Publication type:
- Article
交通运输行业2018 年成绩单公布.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 650
- Publication type:
- Article
Some Key Technical Issues on Construction of Ultra-long Deep-buried Water Conveyance Tunnel under Complex Geological Conditions.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 523, doi. 10.3973/j.issn.2096-4498.2019.04.001
- By:
- Publication type:
- Article
钮新强院士简介.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 536
- Publication type:
- Article
复杂地质条件下跨流域调水超长深埋隧洞建设 需研究的关键技术问题.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 523, doi. 10.3973/j.issn.2096-4498.2019.04.001
- By:
- Publication type:
- Article
Design and Safety Measures of Metro Station in Flood District.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 661, doi. 10.3973/j.issn.2096-4498.2019.04.017
- By:
- Publication type:
- Article
行洪区地铁车站设计及安全措施研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 661, doi. 10.3973/j.issn.2096-4498.2019.04.0017
- By:
- Publication type:
- Article
30 项工程获第16 届中国土木工程詹天佑奖.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 668
- Publication type:
- Article
Annual Statistic Data of Urban Rail Transit in Chinese Mainland in 2018.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 694
- Publication type:
- Article
隧道洞口雪崩防治方案探讨.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 642, doi. 10.3973/j.issn.2096-4498.2019.04.015
- By:
- Publication type:
- Article
深圳地铁14 号线黄木岗站三线换乘方案研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 633, doi. 10.3973/j.issn.2096-4498.2019.04.014
- By:
- Publication type:
- Article
成功穿越国内最复杂水下溶洞群 长沙地铁3 号线湘江隧道顺利贯通.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 632
- Publication type:
- Article
压气条件下泥膜进气值测量试验研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 626, doi. 10.3973/j.issn.2096-4498.2019.04.013
- By:
- Publication type:
- Article
Heat Exhaust Ventilation for Ultra-long GIL Tunnel.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 584, doi. 10.3973/j.issn.2096-4498.2019.04.008
- By:
- Publication type:
- Article
超长GIL 管廊排热通风研.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 584, doi. 10.3973/j.issn.2096-4498.2019.04.008
- By:
- Publication type:
- Article
重力对土体中地下结构地震反应的影响.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 576, doi. 10.3973/j.issn.2096-4498.2019.04.007
- By:
- Publication type:
- Article
宁波地铁机械法联络通道创国内最快贯通纪录.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 570
- Publication type:
- Article
山岭公路隧道洞口美学探析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 563, doi. 10.3973/j.issn.2096-4498.2019.04.005
- By:
- Publication type:
- Article
Achievements and Challenges of Tunneling Technology in China over Past 40 Years.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 537, doi. 10.3973/j.issn.2096-4498.2019.04.002
- By:
- Publication type:
- Article
国内最长“ 顶管施工法” 综合管廊在黄冈开顶.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 618
- Publication type:
- Article
大断面上新统红色泥岩(N<sup>Cr</sup><sub>2</sub>) 隧道支护受力特征研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 609, doi. 10.3973/j.issn.2096-4498.2019.04.011
- By:
- Publication type:
- Article
隧道下穿松散高填土路堤的沉降规律及其影响范围研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 601, doi. 10.3973/j.issn.2096-4498.2019.04.010
- By:
- Publication type:
- Article
沉管隧道干坞基坑格形连续墙支护方案评价及其影响因素.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 571, doi. 10.3973/j.issn.2096-4498.2019.04.006
- By:
- Publication type:
- Article
中国隧道工程技术发展40 年.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 4, p. 537, doi. 10.3973/j.issn.2096-4498.2019.04.002
- By:
- Publication type:
- Article