Works matching IS 20964498 AND DT 2019 AND VI 39 AND IP 2
Results: 31
深中通道建设列入粤港澳大湾区发展规划.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 6
- Publication type:
- Article
16. 2 km! 宁波至舟山将建中国最长海底铁路隧道.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 5
- Publication type:
- Article
中国海外首条水下长大盾构隧道盾构顺利始发.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 5
- Publication type:
- Article
世界最长沉管隧道即将到来! 德国正式批准费马恩隧道建设.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 4
- Publication type:
- Article
挑战世界级难题 中国悬浮隧道工程技术研究进入试验阶段.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 4
- Publication type:
- Article
成都地铁9 号线全自动无人驾驶列车亮相.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 3
- Publication type:
- Article
蒙华铁路隧道全线贯通.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 3
- Publication type:
- Article
2019 年中国铁路总公司开工铁路概况.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 2
- Publication type:
- Article
“ 智慧盾构” 重要一环! 日本开发盾构洞内自动测量系统.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 1
- Publication type:
- Article
8 500 亿元,2019 年中国铁路建设投资将达到史上最高水平.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 1
- Publication type:
- Article
截至2018 年底中国铁路隧道情况统计.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 324
- By:
- Publication type:
- Article
波纹钢板加固盾构隧道衬砌管片抗弯性能试验研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 317, doi. 10.3973/j.issn.2096-4498.2019.02.019
- By:
- Publication type:
- Article
TBM 掘进中滚刀受力实时监测方法研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 309, doi. 10.3973/j.issn.2096-4498.2019.02.018
- By:
- Publication type:
- Article
基于PSO 算法的反力架设计与优化.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 302, doi. 10.3973/j.issn.2096-4498.2019.02.017
- By:
- Publication type:
- Article
基于SolidWorks Simulation 的重叠盾构隧道穿行式 全自动液压支护台车设计研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 294, doi. 10.3973/j.issn.2096-4498.2019.02.016
- By:
- Publication type:
- Article
岩溶隧道瞬变电磁三维超前探测技术研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 287, doi. 10.3973/j.issn.2096-4498.2019.02.015
- By:
- Publication type:
- Article
大跨地铁隧道组合工法穿越断层时的围岩变形控制分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 227, doi. 10.3973/j.issn.2096-4498.2019.02.007
- By:
- Publication type:
- Article
地下叠合墙接触面形式的设计研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 254, doi. 10.3973/j.issn.2096-4498.2019.02.010
- By:
- Publication type:
- Article
拱北隧道5 台阶14 部开挖施工组织方案分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 281, doi. 10.3973/j.issn.2096-4498.2019.02.014
- By:
- Publication type:
- Article
米仓山隧道深大竖井建井新法.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 268, doi. 10.3973/j.issn.2096-4498.2019.02.012
- By:
- Publication type:
- Article
双线地铁隧道泥水及土压平衡盾构施工地层变形特征研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 219, doi. 10.3973/j.issn.2096-4498.2019.02.006
- By:
- Publication type:
- Article
地下车库联络道出入口设计研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 261, doi. 10.3973/j.issn.2096-4498.2019.02.011
- By:
- Publication type:
- Article
中建云地下工程智慧施工系统介绍.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 188
- Publication type:
- Article
海水环境下盾构泥浆性能试验研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 211, doi. 10.3973/j.issn.2096-4498.2019.02.005
- By:
- Publication type:
- Article
基坑变形组合预测分析及安全性评价.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 204, doi. 10.3973/j.issn.2096-4498.2019.02.004
- By:
- Publication type:
- Article
基于深度学习的破碎带盾构施工沉降预测分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 197, doi. 10.3973/j.issn.2096-4498.2019.02.003
- By:
- Publication type:
- Article
港珠澳大桥水下隧道工程的HSE 风险管理应用与示范.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 189, doi. 10.3973/j.issn.2096-4498.2019.02.002
- By:
- Publication type:
- Article
厄瓜多尔CCS 水电站输水隧洞优化设计总结及体会.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 246, doi. 10.3973/j.issn.2096-4498.2019.02.009
- By:
- Publication type:
- Article
高黎贡山隧道1# 竖井( 副井) 突水淹井封堵施工技术.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 275, doi. 10.3973/j.issn.2096-4498.2019.02.013
- By:
- Publication type:
- Article
盾构隧道穿越特殊地质围岩位移向量趋势线变形响应特征.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 240, doi. 10.3973/j.issn.2096-4498.2019.02.008
- By:
- Publication type:
- Article
我国城市地下空间利用现状及发展趋势.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 2, p. 173, doi. 10.3973/j.issn.2096-4498.2019.02.001
- By:
- Publication type:
- Article