Works matching IS 20964498 AND DT 2019 AND VI 39 AND IP 11
Results: 25
压缩空气泡沫系统及其产泡特性研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1815, doi. 10.3973/j.issn.2096-4498.2019.11.009
- By:
- Publication type:
- Article
杭州狭长软土基坑支护侧移规律与解析预测方法研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1797, doi. 10.3973/j.issn.2096-4498.2019.11.007
- By:
- Publication type:
- Article
盾构法T 接隧道结构受力现场试验研究 ---以宁波轨道交通3 号线联络通道为例
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1759, doi. 10.3973/j.issn.2096-4498.2019.11.003
- By:
- Publication type:
- Article
无人驾驶工程电机车亮相甘肃 可接替部分隧道施工危险工作.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1758
- Publication type:
- Article
盾构近距离上跨既有运营隧道施工控制技术.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1898, doi. 10.3973/j.issn.2096-4498.2019.11.019
- By:
- Publication type:
- Article
基于“ CC 工法” 的顶管隧道施工地表变形规律分析与研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1838, doi. 10.3973/j.issn.2096-4498.2019.11.012
- By:
- Publication type:
- Article
微震监测技术在某深埋铁路隧道施工管理中的应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1881, doi. 10.3973/j.issn.2096-4498.2019.11.017
- By:
- Publication type:
- Article
管幕冻结法钢管-冻土接触面剪切试验研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1864, doi. 10.3973/j.issn.2096-4498.2019.11.015
- By:
- Publication type:
- Article
隧道“奥斯卡”颁奖啦! 2019 年隧协大奖公布,8 项大奖花落谁家?
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1880
- Publication type:
- Article
基于矿山法铁路隧道复合式衬砌断面尺寸的施工问题 分析及解决对策探讨
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1871, doi. 10.3973/j.issn.2096-4498.2019.11.016
- By:
- Publication type:
- Article
东京外环道路工程拒绝尘土飞扬 5. 3 km 长距离皮带输送机出渣.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1863
- Publication type:
- Article
铁路隧道接触网可更换预埋槽道新型锚杆型式研究及有限元分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1856, doi. 10.3973/j.issn.2096-4498.2019.11.014
- By:
- Publication type:
- Article
复合地层中不同盾构掘进参数下碴土的颗粒特征研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1848, doi. 10.3973/j.issn.2096-4498.2019.11.013
- By:
- Publication type:
- Article
钢筋锈蚀对上海地铁盾构隧道纵缝接头抗弯力学性能影响研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1823, doi. 10.3973/j.issn.2096-4498.2019.11.010
- By:
- Publication type:
- Article
地下变换刀盘直径 双直径TBM 将用于美国德州排水隧道工程.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1822
- Publication type:
- Article
我国几类特殊地质条件铁路隧道修建问题与对策概述.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1748, doi. 10.3973/j.issn.2096-4498.2019.11.002
- By:
- Publication type:
- Article
基于现场试验的TBM 滚刀磨损分析及预测.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1914, doi. 10.3973/j.issn.2096-4498.2019.11.021
- By:
- Publication type:
- Article
大断面箱涵推进微扰动施工技术应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1905, doi. 10.3973/j.issn.2096-4498.2019.11.020
- By:
- Publication type:
- Article
明挖隧道施工期间下方共线地铁盾构区间上浮控制技术 ---以深圳市桂庙路快速化改造工程为例
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1888, doi. 10.3973/j.issn.2096-4498.2019.11.018
- By:
- Publication type:
- Article
利用地下空间助力发展绿色建筑与绿色城市.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1737, doi. 10.3973/j.issn.2096-4498.2019.11.001
- By:
- Publication type:
- Article
地铁盾构隧道洞门钢环精密检测与数据处理方法研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1832, doi. 10.3973/j.issn.2096-4498.2019.11.011
- By:
- Publication type:
- Article
深埋老黄土隧道围岩劣化对支护受力影响分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1806, doi. 10.3973/j.issn.2096-4498.2019.11.008
- By:
- Publication type:
- Article
防水密封垫布置方式对管片接头的力学影响分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1790, doi. 10.3973/j.issn.2096-4498.2019.11.006
- By:
- Publication type:
- Article
盾构隧道内堆载引起的隧道转动和错台变形计算.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1781, doi. 10.3973/j.issn.2096-4498.2019.11.005
- By:
- Publication type:
- Article
高地温隧道荷载模式及二次衬砌安全特性研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 11, p. 1769, doi. 10.3973/j.issn.2096-4498.2019.11.004
- By:
- Publication type:
- Article