Works matching IS 20964498 AND DT 2019 AND VI 39 AND IP 1
Results: 22
郑万高铁湖北段隧道风险评估与控制对策综述.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 157
- By:
- Publication type:
- Article
TBM 刀盘系统不确定工况下的动力学特性分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 148
- By:
- Publication type:
- Article
富水昔格达组软弱易滑地层PBA 进洞法实践.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 139
- By:
- Publication type:
- Article
地铁低压配电设计问题研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 125
- By:
- Publication type:
- Article
让压锚杆让压管长度的解析设计方法.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 119
- By:
- Publication type:
- Article
隧道施工不良地质探地雷达超前探测全波形反演研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 102
- By:
- Publication type:
- Article
拱北隧道管幕工程顶管间距计算分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 94
- By:
- Publication type:
- Article
砂岩热损伤微观结构与宏观物理特性演化规律研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 75
- By:
- Publication type:
- Article
铁路隧道工程超挖回填费用计算规则研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 81
- By:
- Publication type:
- Article
长大地铁区间隧道火灾可用安全疏散时间算法研究及应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 54
- By:
- Publication type:
- Article
基于损伤扩容理论的圆形隧洞围岩松动圈位移计算方法.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 40
- By:
- Publication type:
- Article
超特长隧洞TBM 集群试掘进阶段适应性分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 1
- By:
- Publication type:
- Article
Construction of a Long-distance and Shallow-buried Tunnel Using Curved Pipe Roof and Freezing Method: Gongbei Tunnel of Hong Kong-Zhuhai-Macao Bridge Project.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 164
- By:
- Publication type:
- Article
长距离曲线管幕冻结浅埋暗挖隧道工程---港珠澳大桥拱北隧道.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 164
- By:
- Publication type:
- Article
地下轨道交通和综合管廊协同建设相关问题研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 130
- By:
- Publication type:
- Article
盾构法联络通道密封垫设计及防水试验研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 110
- By:
- Publication type:
- Article
倒虹吸隧道智能排污结构构想与数值分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 85
- By:
- Publication type:
- Article
基于数据驱动的隧道地质信息精细化管理系统研发与应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 68
- By:
- Publication type:
- Article
平行隧道穿越形式对砌体建筑变形的影响研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 60
- By:
- Publication type:
- Article
基于围岩力学参数的TBM 净掘进速率多元回归预测模型.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 48
- By:
- Publication type:
- Article
基于 DEMATEL 的综合管廊运维管理风险因素研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 31
- By:
- Publication type:
- Article
偏压隧道洞口段坡体钢花管注浆加固效果分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2019, v. 39, n. 1, p. 23
- By:
- Publication type:
- Article