Works matching IS 20964498 AND DT 2018 AND VI 38 AND IP 5
Results: 26
ϕ1.22 m微型土压平衡盾构液压系统设计与研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 857, doi. 10.3973/j.issn.2096-4498.2018.05.021
- By:
- Publication type:
- Article
标准环+转弯环的双面楔形盾构管片排版技术研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 805, doi. 10.3973/j.issn.2096-4498.2018.05.013
- By:
- Publication type:
- Article
地铁盾构施工对上覆平行雨污管道影响的试验和数值分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 797, doi. 10.3973/j.issn.2096-4498.2018.05.012
- By:
- Publication type:
- Article
明挖公路隧道基坑钢支撑轴力监测与数值模拟分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 740, doi. 10.3973/j.issn.2096-4498.2018.05.003
- By:
- Publication type:
- Article
砂卵石地层泥水盾构施工技术难点及控制措施分析--以兰州地铁穿黄隧道工程为例
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 846, doi. 10.3973/j.issn.2096-4498.2018.05.019
- By:
- Publication type:
- Article
盾构掘进破坏孤石诱发地层塌陷的灾变机制研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 824, doi. 10.3973/j.issn.2096-4498.2018.05.016
- By:
- Publication type:
- Article
沉管隧道纵向静力计算问题探讨.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 790, doi. 10.3973/j.issn.2096-4498.2018.05.011
- By:
- Publication type:
- Article
综合管廊U型盾构机械化施工工法研究与应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 839, doi. 10.3973/j.issn.2096-4498.2018.05.018
- By:
- Publication type:
- Article
山岭隧道施工人员辐射剂量评估方法及应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 776, doi. 10.3973/j.issn.2096-4498.2018.05.009
- By:
- Publication type:
- Article
复合地层泥水盾构环流关键参数选择探析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 771, doi. 10.3973/j.issn.2096-4498.2018.05.008
- By:
- Publication type:
- Article
基于改进熵权与灰色模糊理论的城市轨道交通PPP项目风险评价研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 732, doi. 10.3973/j.issn.2096-4498.2018.05.002
- By:
- Publication type:
- Article
模板台车定位和空洞监控系统的设计及应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 873, doi. 10.3973/j.issn.2096-4498.2018.05.023
- By:
- Publication type:
- Article
日本大林组开发高流动性混凝土 可减少 35% 原材料费用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 838
- Publication type:
- Article
盾构砂性渣土-泡沫混合物渗透性影响因素研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 833, doi. 10.3973/j.issn.2096-4498.2018.05.017
- By:
- Publication type:
- Article
拱北隧道管幕冷冻施工中的冻胀控制技术研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 809, doi. 10.3973/j.issn.2096-4498.2018.05.014
- By:
- Publication type:
- Article
岩溶富水区铁路隧道加厚底板结构施工力学行为研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 757, doi. 10.3973/j.issn.2096-4498.2018.05.006
- By:
- Publication type:
- Article
站台也在隧道内:美国加州圣何塞BART轨交工程批准建设.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 856
- Publication type:
- Article
隧道成型控制爆破技术及围岩损伤范围研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 851, doi. 10.3973/j.issn.2096-4498.2018.05.020
- By:
- Publication type:
- Article
基于可拓学理论的TBM掘进效率地质影响因素研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 782, doi. 10.3973/j.issn.2096-4498.2018.05.010
- By:
- Publication type:
- Article
站台也在隧道内:美国加州圣何塞 BART 轨交工程批准建设.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 3
- Publication type:
- Article
捷克 Rokycany-Pilsen 轨交线双管隧道贯通 为双模式盾构在东欧的首次应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 2
- Publication type:
- Article
日本大林组开发高流动性混凝土 可减少35%原材料费用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 2
- Publication type:
- Article
日本东急建设等多家单位开发了隧道检测、监测系统.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 1
- Publication type:
- Article
19.2 km 东湖深隧全面开工 系国内最长深层污水传输隧道.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 1
- Publication type:
- Article
地面堆载条件下交叉穿越隧道的竖向位移计算方法研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 818, doi. 10.3973/j.issn.2096-4498.2018.05.015
- By:
- Publication type:
- Article
跨孔CT法在地铁工程桩基间距探测中的应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2018, v. 38, n. 5, p. 747, doi. 10.3973/j.issn.2096-4498.2018.05.004
- By:
- Publication type:
- Article