Works matching IS 2096-5052 AND VI 4 AND IP 3 AND DT 2022


Results: 9
    1
    2
    3
    4
    5
    6

    双模盾构机/TBM的原理与应用.

    Published in:
    Hazard Control in Tunnelling & Underground Engineering, 2022, v. 4, n. 3, p. 47, doi. 10.19952/j.cnki.2096-5052.2022.03.04
    By:
    • 钟长平;
    • 竺维彬;
    • 王俊彬;
    • 谢文达
    Publication type:
    Article
    7
    8
    9