基于图像点云的多维度隧道初期支护大变形监测研究和应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 795, doi. 10.3973/j.issn.2096-4498.2021.05.013
- By:
- Publication type:
- Article
基于深度学习的盾构竖向姿态组合预测.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 758, doi. 10.3973/j.issn.2096-4498.2021.05.008
- By:
- Publication type:
- Article
基于模糊贝叶斯证据理论的盾构下穿既有隧道安全风险评价.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 713, doi. 10.3973/j.issn.2096-4498.2021.05.003
- By:
- Publication type:
- Article
户田建设开发架设钢架支护的工作面无人施工系统.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 857
- Publication type:
- Article
基于工程经验法的山岭公路隧道信息化设计体系研究及应用.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 849, doi. 10.3973/j.issn.2096-4498.2021.05.019
- By:
- Publication type:
- Article
非等断面交叉洞室三角区围岩应力集中理论研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 781, doi. 10.3973/j.issn.2096-4498.2021.05.011
- By:
- Publication type:
- Article
铁路隧道混凝土理论消耗量分析及计算.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 721, doi. 10.3973/j.issn.2096-4498.2021.05.004
- By:
- Publication type:
- Article
软弱地层敞开式TBM 超前注浆加固技术研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 858, doi. 10.3973/j.issn.2096-4498.2021.05.020
- By:
- Publication type:
- Article
西安地区不同线型预制式管廊地震稳定性数值分析.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 772, doi. 10.3973/j.issn.2096-4498.2021.05.010
- By:
- Publication type:
- Article
国内首条深层污水传输隧道稳定运行.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 739
- Publication type:
- Article
考虑盾壳与土体摩擦力的盾构下穿既有地铁隧道施工控制研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 729, doi. 10.3973/j.issn.2096-4498.2021.05.005
- By:
- Publication type:
- Article
滚刀状态实时诊断技术在超大直径泥水盾构中的应用 ———以汕头苏埃通道为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 865, doi. 10.3973/j.issn.2096-4498.2021.05.021
- By:
- Publication type:
- Article
泥岩夹砂岩顺层大跨度隧道力学特征研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 740, doi. 10.3973/j.issn.2096-4498.2021.05.006
- By:
- Publication type:
- Article
暗挖综合管廊的发展和研究方向.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 764, doi. 10.3973/j.issn.2096-4498.2021.05.009
- By:
- Publication type:
- Article
无锡太湖广场地下空间综合体设计研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 841, doi. 10.3973/j.issn.2096-4498.2021.05.018
- By:
- Publication type:
- Article
地铁车站轨顶风道装配式技术研究 ———以北京地铁19 号线一期工程为例.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 814, doi. 10.3973/j.issn.2096-4498.2021.05.015
- By:
- Publication type:
- Article
地铁矿山法隧道装配式二次衬砌结构设计初步研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 822, doi. 10.3973/j.issn.2096-4498.2021.05.016
- By:
- Publication type:
- Article
单跨5 车道公路隧道工法优化及施工力学特性研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 831, doi. 10.3973/j.issn.2096-4498.2021.05.017
- By:
- Publication type:
- Article
世界隧道工程技术发展主流趋势———安全、经济、绿色和艺术.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 693, doi. 10.3973/j.issn.2096-4498.2021.05.001
- By:
- Publication type:
- Article
TBM 掘进岩渣图像分割与识别方法研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 803, doi. 10.3973/j.issn.2096-4498.2021.05.014
- By:
- Publication type:
- Article
Study on Countermeasures for Major Unfavorable Geological Issues of Tunnels on Sichuan-Tibet Railway.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 697, doi. 10.3973/j.issn.2096-4498.2021.05.002
- By:
- Publication type:
- Article
Data Statistics and Development Analysis of Urban Rail Transit in China in 2020.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 871
- By:
- Publication type:
- Article
BOT 模式城市隧道项目中期评估方法的研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 789, doi. 10.3973/j.issn.2096-4498.2021.05.012
- By:
- Publication type:
- Article
4 线车站浅埋隧道施工过程中锚杆受力特性研究.
- Published in:
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban), 2021, v. 41, n. 5, p. 749, doi. 10.3973/j.issn.2096-4498.2021.05.007
- By:
- Publication type:
- Article