Works matching IS 20957874 AND DT 2020 AND VI 40 AND IP 4


Results: 16
    1
    2

    打桩全程监测技术的应用.

    Published in:
    China Harbour Engineering, 2020, v. 40, n. 4, p. 51, doi. 10.7640/zggwjs202004011
    By:
    • 黎双邵;
    • 孙红梅
    Publication type:
    Article
    3
    4
    5
    6
    7

    集中式省水船闸若干问题研究.

    Published in:
    China Harbour Engineering, 2020, v. 40, n. 4, p. 6, doi. 10.7640/zggwjs202004002
    By:
    • 何思远;
    • 于贝;
    • 戈国庆;
    • 杨晓松;
    • 刘韬
    Publication type:
    Article
    8
    9
    10
    11
    12

    长江水运干线环境监测网的探讨.

    Published in:
    China Harbour Engineering, 2020, v. 40, n. 4, p. 21, doi. 10.7640/zggwjs202004005
    By:
    • 王勖;
    • 韩兆兴;
    • 杨顺益;
    • 罗宏伟;
    • 闵奋力;
    • 王茜茜;
    • 范娟
    Publication type:
    Article
    13
    14
    15
    16