Works matching IS 20957874 AND DT 2020 AND VI 40 AND IP 10


Results: 16
    1
    2
    3

    沉管隧道主结构设计优化方法.

    Published in:
    China Harbour Engineering, 2020, v. 40, n. 10, p. 28, doi. 10.7640/zggwjs202010007
    By:
    • 林巍;
    • 田英辉;
    • 刘凌锋;
    • 邹威;
    • 刘孟源;
    • 陈猛
    Publication type:
    Article
    4

    非对称异型沉箱出运技术.

    Published in:
    China Harbour Engineering, 2020, v. 40, n. 10, p. 51, doi. 10.7640/zggwjs202010011
    By:
    • 张志斌;
    • 杨彦豪;
    • 徐亮
    Publication type:
    Article
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16