Works matching IS 20957874 AND DT 2018 AND VI 38 AND IP 7


Results: 16
    1

    沉管碎石基床清淤新方法.

    Published in:
    China Harbour Engineering, 2018, v. 38, n. 7, p. 52, doi. 10.7640/zggwjs201807012
    By:
    • 张乃受;
    • 冯海暴
    Publication type:
    Article
    2
    3
    4
    5
    6
    7
    8
    9
    10

    吹填土固结模型及其应用研究.

    Published in:
    China Harbour Engineering, 2018, v. 38, n. 7, p. 1, doi. 10.7640/zggwjs201807001
    By:
    • 余裕超;
    • 曹丽文;
    • 王帅;
    • 王贺;
    • 魏新栋
    Publication type:
    Article
    11
    12
    13
    14
    15
    16