Works matching IS 20957874 AND DT 2017 AND VI 37 AND IP 11


Results: 18
    1
    2
    3
    4
    5
    6
    7

    上海市军工路港区拔桩技术.

    Published in:
    China Harbour Engineering, 2017, v. 37, n. 11, p. 21, doi. 10.7640/zggwjs201711004
    By:
    • 蒋跃楠;
    • 陈雨青;
    • 滕磊
    Publication type:
    Article
    8
    9
    10
    11
    12
    13

    沉箱抛石基床整平施工技术.

    Published in:
    China Harbour Engineering, 2017, v. 37, n. 11, p. 60, doi. 10.7640/zggwjs201711013
    By:
    • 胡学文;
    • 陶然;
    • 熊韬;
    • 黄睿奕
    Publication type:
    Article
    14
    15
    16
    17
    18