Works matching IS 20957874 AND DT 2015 AND VI 35 AND IP 7


Results: 40
    1
    2
    3
    4
    5
    6
    7

    大型预制构件顶推方案选型.

    Published in:
    China Harbour Engineering, 2015, v. 35, n. 7, p. 120, doi. 10.7640/zggwjs201507034
    By:
    • 彭晓鹏;
    • 李阳;
    • 李海峰
    Publication type:
    Article
    8
    9
    10
    11

    沉管顶推施工的保障措施.

    Published in:
    China Harbour Engineering, 2015, v. 35, n. 7, p. 105, doi. 10.7640/zggwjs201507030
    By:
    • 李海峰;
    • 刘远林
    Publication type:
    Article
    12

    超大型沉管顶推技术.

    Published in:
    China Harbour Engineering, 2015, v. 35, n. 7, p. 100, doi. 10.7640/zggwjs201507029
    By:
    • 陈伟彬;
    • 刘远林;
    • 李海峰
    Publication type:
    Article
    13
    14
    15
    16
    17
    18
    19
    20

    扭工字块安装施工技术.

    Published in:
    China Harbour Engineering, 2015, v. 35, n. 7, p. 70, doi. 10.7640/zggwjs201507021
    By:
    • 吴平;
    • 邵亮;
    • 王聪
    Publication type:
    Article
    21
    22
    23
    24
    25
    26
    27
    28
    29
    30
    31
    32

    工厂法预制沉管控裂技术.

    Published in:
    China Harbour Engineering, 2015, v. 35, n. 7, p. 28, doi. 10.7640/zggwjs201507009
    By:
    • 刘然;
    • 王李;
    • 范卓凡
    Publication type:
    Article
    33
    34
    35
    36
    37
    38
    39
    40