Works matching IS 20834187 AND DT 2015 AND VI 95 AND IP 3
Results: 8
Comprehensive Study on Bituminous Coal Oxidation by TGA-DTA-FTIR Experiment.
- Published in:
- Journal of Power Technologies, 2015, v. 95, n. 3, p. 167
- By:
- Publication type:
- Article
Thermodynamic and economic evaluation of a CO<sub>2</sub> membrane separation unit integrated into a supercritical coal-fired heat and power plant.
- Published in:
- Journal of Power Technologies, 2015, v. 95, n. 3, p. 201
- By:
- Publication type:
- Article
Off-design operation of an 900 MW-class power plant with utilization of low temperature heat of flue gases.
- Published in:
- Journal of Power Technologies, 2015, v. 95, n. 3, p. 221
- By:
- Publication type:
- Article
Thermal-Hydraulic Analysis of Single and Multiple Steam Generator Tube Ruptures in a Typical 3-Loop PWR.
- Published in:
- Journal of Power Technologies, 2015, v. 95, n. 3, p. 175
- By:
- Publication type:
- Article
Thermo-economic optimization of air bottoming cycles.
- Published in:
- Journal of Power Technologies, 2015, v. 95, n. 3, p. 211
- By:
- Publication type:
- Article
Mathematical model of Combined Heat and Power Plant using GateCycle™ software.
- Published in:
- Journal of Power Technologies, 2015, v. 95, n. 3, p. 183
- By:
- Publication type:
- Article
Selecting the configuration of inter-stage coolers for a CO<sub>2</sub> compressor.
- Published in:
- Journal of Power Technologies, 2015, v. 95, n. 3, p. 228
- By:
- Publication type:
- Article
Evaluation of IPSEpro extended by MATLAB applied to Steam Turbine Cycle analysis.
- Published in:
- Journal of Power Technologies, 2015, v. 95, n. 3, p. 192
- By:
- Publication type:
- Article