Works matching IS 18657362 AND DT 2022 AND VI 15 AND IP 2
Results: 18
Books: Geomechanics and Tunnelling 2/2022.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 163, doi. 10.1002/geot.202270205
- Publication type:
- Article
Preview: Geomechanics and Tunneling 3/2022.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 244, doi. 10.1002/geot.202270209
- Publication type:
- Article
Imprint: Geomechanics and Tunneling 2/2022.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 243, doi. 10.1002/geot.202270208
- Publication type:
- Article
Diary of Events: Geomechanics and Tunnelling 2/2022.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 241, doi. 10.1002/geot.202270207
- Publication type:
- Article
Site Reports: Geomechanics and Tunneling 2/2022.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 239, doi. 10.1002/geot.202270206
- Publication type:
- Article
News: Geomechanics and Tunnelling 2/2022.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 151, doi. 10.1002/geot.202270204
- Publication type:
- Article
Digitisation in Tunnelling – Engineering.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 150, doi. 10.1002/geot.202270203
- Publication type:
- Article
Content: Geomechanics and Tunnelling 2/2022.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 1, doi. 10.1002/geot.202270202
- Publication type:
- Article
Cover Picture: Geomechanics and Tunnelling 2/2022.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 1, doi. 10.1002/geot.202270201
- Publication type:
- Article
Use of BIM technology for optimization and virtual build of TBM tunnels.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 175, doi. 10.1002/geot.202100078
- By:
- Publication type:
- Article
Demands on digital data capturing of TBM and conventional tunnel drives.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 207, doi. 10.1002/geot.202100077
- By:
- Publication type:
- Article
Potential applications of machine learning for BIM in tunnelling.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 216, doi. 10.1002/geot.202100076
- By:
- Publication type:
- Article
Use of BIM for the optimized operation of road tunnels: Modelling approach, information requirements, and exemplary implementation.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 167, doi. 10.1002/geot.202100074
- By:
- Publication type:
- Article
Norwegian tunnel excavation: Increasing digitalisation in all operations.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 182, doi. 10.1002/geot.202100072
- By:
- Publication type:
- Article
Improving face decisions in tunnelling by machine learning‐based MWD analysis.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 222, doi. 10.1002/geot.202100070
- By:
- Publication type:
- Article
Dynamic evaluation of the top‐down construction of the Belfiore high‐speed railway station.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 201, doi. 10.1002/geot.202100069
- By:
- Publication type:
- Article
Virtual reality simulator for pipe umbrella installation works.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 233, doi. 10.1002/geot.202100062
- By:
- Publication type:
- Article
New built and refurbished railway tunnels: Data delivery from BIM Models to OEBB's asset management.
- Published in:
- Geomechanik und Tunnelbau, 2022, v. 15, n. 2, p. 190, doi. 10.1002/geot.202100071
- By:
- Publication type:
- Article