Works matching IS 18657362 AND DT 2010 AND VI 3 AND IP 2
Results: 19
Results from the Untersammelsdorf test field for the planning of tunnelling work /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 201, doi. 10.1002/geot.201000017
- By:
- Publication type:
- Article
Austrian Southern Railway Link Conference 2009 /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 90, doi. 10.1002/geot.201090015
- By:
- Publication type:
- Article
Diary of Events: Geomechanics and Tunnelling 2/2010.
- Published in:
- 2010
- Publication type:
- Calendar
News: Geomechanics and Tunnelling 2/2010.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 93, doi. 10.1002/geot.201090016
- Publication type:
- Article
Geomechanical knowledge gained from the Paierdorf investigation tunnel in the section through the Lavanttal main fault zone /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 163, doi. 10.1002/geot.201000014
- By:
- Publication type:
- Article
New development of a crack-limited invert slab /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 185, doi. 10.1002/geot.201000016
- By:
- Publication type:
- Article
Semmering and Koralm tunnels.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. NA, doi. 10.1002/geot.201090014
- Publication type:
- Article
Improvement of the safety and profitability of tunnel drives through the use of automated measurement and alarm systems – examples in practice /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 215, doi. 10.1002/geot.201000018
- By:
- Publication type:
- Article
Content: Geomechanics and Tunnelling 2/2010.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. NA, doi. 10.1002/geot.201090017
- Publication type:
- Article
New Semmering Base Tunnel – the current state of tunnel design taking the newest investigation results into account /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 130, doi. 10.1002/geot.201000012
- By:
- Publication type:
- Article
Current state of design, investigation and construction works at the Koralm Tunnel /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 155, doi. 10.1002/geot.201000019
- By:
- Publication type:
- Article
The New Semmering Base Tunnel project – an interdisciplinary challenge /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 110, doi. 10.1002/geot.201000009
- By:
- Publication type:
- Article
Imprint: Geomechanics and Tunnelling 2/2010.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 231, doi. 10.1002/geot.201090012
- Publication type:
- Article
Geomechanics and Tunnelling 3/2010.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 232, doi. 10.1002/geot.201090013
- Publication type:
- Article
New Semmering Base Tunnel – the investigation programme 2008/2009 and the knowledge gained in the areas of geology, hydrogeology and geotechnical engineering /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 119, doi. 10.1002/geot.201000010
- By:
- Publication type:
- Article
The ventilation and tunnel safety concept for the New Semmering Base Tunnel /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 143, doi. 10.1002/geot.201000013
- By:
- Publication type:
- Article
Solution methods for the design and construction of contract KAT3 of the Koralm Tunnel /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 174, doi. 10.1002/geot.201000015
- By:
- Publication type:
- Article
Investment in the Austrian rail network – overview of new and upgrading projects /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 101, doi. 10.1002/geot.201000011
- By:
- Publication type:
- Article
New rotor machine from Aliva, AL - 267 /.
- Published in:
- Geomechanik und Tunnelbau, 2010, v. 3, n. 2, p. 225, doi. 10.1002/geot.201090010
- Publication type:
- Article