Works matching IS 16732049 AND DT 2021 AND VI 38 AND IP 5
Results: 7
高寒地区组合梁斜拉桥施工阶段温度效应研究.
- Published in:
- Journal of Architecture & Civil Engineering, 2021, v. 38, n. 5, p. 107, doi. 10.19815/j.jace.2021.04004
- By:
- Publication type:
- Article
埋深条件下含承台能量桩基础换热效率及热力响应现场试验.
- Published in:
- Journal of Architecture & Civil Engineering, 2021, v. 38, n. 5, p. 99, doi. 10.19815/j.jace.2021.03066
- By:
- Publication type:
- Article
重组竹受弯短期蠕变性能试验.
- Published in:
- Journal of Architecture & Civil Engineering, 2021, v. 38, n. 5, p. 91, doi. 10.19815/j.jace.2020.10062
- By:
- Publication type:
- Article
掺粉煤灰再生混凝土反向湿度响应规律与预测模型研究.
- Published in:
- Journal of Architecture & Civil Engineering, 2021, v. 38, n. 5, p. 83, doi. 10.19815/j.jace.2020.11037
- By:
- Publication type:
- Article
废弃纤维再生混凝土黏结性能试验.
- Published in:
- Journal of Architecture & Civil Engineering, 2021, v. 38, n. 5, p. 66, doi. 10.19815/j.jace.2021.03092
- By:
- Publication type:
- Article
纤维掺量对再生砖粉 ECC 流动性能及力学性能的影响.
- Published in:
- Journal of Architecture & Civil Engineering, 2021, v. 38, n. 5, p. 74, doi. 10.19815/j.jace.2021.03080
- By:
- Publication type:
- Article
黄土隧道洞口浅埋段塌方冒顶处治及效果分析.
- Published in:
- Journal of Architecture & Civil Engineering, 2021, v. 38, n. 5, p. 118, doi. 10.19815/j.jace.2020.09053
- By:
- Publication type:
- Article