Works matching IS 16727479 AND DT 2025 AND VI 51 AND IP 1


Results: 25
    1
    2
    3

    地铁车站渗漏水组合探测与处理研究.

    Published in:
    Railway Investigation & Surveying, 2025, v. 51, n. 1, p. 150, doi. 10.19630/j.cnki.tdkc.202404180001
    By:
    • 陈 挺;
    • 石鲁宁;
    • 孙曦源;
    • 高博洋;
    • 沈 忱;
    • 李建军;
    • 申巧凤
    Publication type:
    Article
    4
    5
    6
    7
    8
    9
    10
    11
    12

    混凝土桥梁收缩徐变研究综述.

    Published in:
    Railway Investigation & Surveying, 2025, v. 51, n. 1, p. 103, doi. 10.19630/j.cnki.tdkc.202404160003
    By:
    • 秦寰宇;
    • 高泽刚;
    • 李 波;
    • 张德旺
    Publication type:
    Article
    13
    14
    15
    16

    郑州南站功能定位研究.

    Published in:
    Railway Investigation & Surveying, 2025, v. 51, n. 1, p. 75, doi. 10.19630/j.cnki.tdkc.202402220003
    By:
    • 董叶超;
    • 周宇清;
    • 朱聪超
    Publication type:
    Article
    17
    18
    19
    20
    21
    22

    顶管诱发条形基础沉降特征分析.

    Published in:
    Railway Investigation & Surveying, 2025, v. 51, n. 1, p. 26, doi. 10.19630/j.cnki.tdkc.202406070001
    By:
    • 高 兴;
    • 沈宇鹏;
    • 徐善杰;
    • 裴辰宇
    Publication type:
    Article
    23
    24
    25