Works matching IS 16727479 AND DT 2024 AND VI 50 AND IP 2
Results: 26
DEM 粗差权值衰减迭代探测算法研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 27, doi. 10.19630/j.cnki.tdkc.202309220001
- By:
- Publication type:
- Article
铁路长大隧道横向贯通精度预计仿真计算软件设计.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 16, doi. 10.19630/j.cnki.tdkc.202307170001
- By:
- Publication type:
- Article
盾构隧道洞门钢环空间三维坐标及形态拟合算法.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 33, doi. 10.19630/j.cnki.tdkc.202308160001
- By:
- Publication type:
- Article
一种稳健空间圆拟合方法及其在地铁洞门环 检测中的应用.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 22, doi. 10.19630/j.cnki.tdkc.202311280003
- By:
- Publication type:
- Article
基于 BIM 公共数据环境的装配式建筑协同管理 措施研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 171, doi. 10.19630/j.cnki.tdkc.202306120001
- By:
- Publication type:
- Article
基于装配式理念的铁路低站台加高模块设计研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 162, doi. 10.19630/j.cnki.tdkc.202312100001
- By:
- Publication type:
- Article
基于灌浆套筒安装的车辆段预制轨道立柱试验研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 156, doi. 10.19630/j.cnki.tdkc.202311290001
- By:
- Publication type:
- Article
路基沉降对无砟轨道力学性能及运行舒适性影响研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 147, doi. 10.19630/j.cnki.tdkc.202310140001
- By:
- Publication type:
- Article
砂卵石地层中地铁盾构隧道开挖面稳定性 离散元数值模拟研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 140, doi. 10.19630/j.cnki.tdkc.202303300003
- By:
- Publication type:
- Article
基于层次分析法的平行多孔小净距隧道施工方案研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 133, doi. 10.19630/j.cnki.tdkc.202311170003
- By:
- Publication type:
- Article
内马铁路穿越大型裂谷工程地质特征及设计方案研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 125, doi. 10.19630/j.cnki.tdkc.202304210001
- By:
- Publication type:
- Article
新建市政隧道下穿多线运营铁路施工地表沉降研究 ———以郑州火车站操场街隧道工程为例.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 117, doi. 10.19630/j.cnki.tdkc.202302200006
- By:
- Publication type:
- Article
跨座式单轨车桥时频分布特征与桥梁频率间接识别研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 110, doi. 10.19630/j.cnki.tdkc.202310110001
- By:
- Publication type:
- Article
嵌岩深度对下伏溶洞桥梁桩基承载特性影响分析.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 104, doi. 10.19630/j.cnki.tdkc.202311240001
- By:
- Publication type:
- Article
预应力混凝土矮塔斜拉桥 0 号块钢束布置方案研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 98, doi. 10.19630/j.cnki.tdkc.202306220001
- By:
- Publication type:
- Article
嘉善至西塘市域铁路速度目标值研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 91, doi. 10.19630/j.cnki.tdkc.202311160002
- By:
- Publication type:
- Article
西安至十堰高速铁路环保选线研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 85, doi. 10.19630/j.cnki.tdkc.202307040001
- By:
- Publication type:
- Article
铁路装卸车环线上调车机取代本务机作业可行性研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 79, doi. 10.19630/j.cnki.tdkc.202307040002
- By:
- Publication type:
- Article
城市轨道交通隧道综合岩溶勘察技术创新应用.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 71, doi. 10.19630/j.cnki.tdkc.202308010002
- By:
- Publication type:
- Article
基于正交实验的西北地区弱膨胀性围岩相似材料 配比研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 64, doi. 10.19630/j.cnki.tdkc.202308310002
- By:
- Publication type:
- Article
城际铁路隐伏活动断层勘察方法研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 58, doi. 10.19630/j.cnki.tdkc.202306090001
- By:
- Publication type:
- Article
花岗岩地区地铁风井深基坑工程地质条件研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 50, doi. 10.19630/j.cnki.tdkc.202307180001
- By:
- Publication type:
- Article
强干扰环境下高铁隧底隐伏岩溶探测应用研究.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 45, doi. 10.19630/j.cnki.tdkc.202308220001
- By:
- Publication type:
- Article
普速铁路桥梁灾后应急保障测绘研究 ———以太焦铁路白水河八号桥水害抢险修复工程为例.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 39, doi. 10.19630/j.cnki.tdkc.202308070002
- By:
- Publication type:
- Article
铁路下承式连续钢桁梁桥静动力性能评估.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 1, doi. 10.19630/j.cnki.tdkc.202309190001
- By:
- Publication type:
- Article
多源融合高精度定位技术在铁路行业的应用展望.
- Published in:
- Railway Investigation & Surveying, 2024, v. 50, n. 2, p. 8, doi. 10.19630/j.cnki.tdkc.202312080002
- By:
- Publication type:
- Article