Works matching IS 16714563 AND DT 2020 AND VI 27 AND IP 3


Results: 24
    1
    2
    3
    4
    5
    6

    DCM船施工管理系统.

    Published in:
    Guangdong Architecture Civil Engineering, 2020, v. 27, n. 3, p. 65, doi. 10.19731/j.gdtmyjz.2020.03.019
    By:
    • 冼嘉和;
    • 吴晓锋;
    • 王 冲
    Publication type:
    Article
    7
    8
    9
    10

    大型异形沉箱安装施工技术.

    Published in:
    Guangdong Architecture Civil Engineering, 2020, v. 27, n. 3, p. 50, doi. 10.19731/j.gdtmyjz.2020.03.015
    By:
    • 胡振华;
    • 梁旭清;
    • 磊, 马
    Publication type:
    Article
    11
    12
    13
    14
    15
    16
    17

    关于装配式建筑设计路线的探索.

    Published in:
    Guangdong Architecture Civil Engineering, 2020, v. 27, n. 3, p. 26, doi. 10.19731/j.gdtmyjz.2020.03.008
    By:
    • 任乐民;
    • 谢合舜;
    • 陈帅光;
    • 周裕利;
    • 邹 毅
    Publication type:
    Article
    18
    19
    20
    21
    22
    23
    24

    重塑黏土侧压力的试验研究.

    Published in:
    Guangdong Architecture Civil Engineering, 2020, v. 27, n. 3, p. 1, doi. 10.19731/j.gdtmyjz.2020.03.001
    By:
    • 万梁龙
    Publication type:
    Article