Works matching IS 1553779X AND DT 2006 AND VI 5 AND IP 1
Results: 7
Non-Contact Determination of the Phase Sequence and Voltage Level of Overhead Conductors in Air Insulated Substations.
- Published in:
- International Journal of Emerging Electric Power Systems, 2006, v. 5, n. 1, p. 1, doi. 10.2202/1553-779X.1299
- By:
- Publication type:
- Article
Steady State Overvoltages of TCSC Terminals and Their Impact on Degree of Compensation and Transmitted Power of Radical Power System.
- Published in:
- International Journal of Emerging Electric Power Systems, 2006, v. 5, n. 1, p. 1
- By:
- Publication type:
- Article
Optimal Number and Location of TCSC and Loadability Enhancement in Deregulated Electricity Markets Using MINLP.
- Published in:
- International Journal of Emerging Electric Power Systems, 2006, v. 5, n. 1, p. 1, doi. 10.2202/1553-779X.1117
- By:
- Publication type:
- Article
Online Condition Monitoring of Line-Insulator Leakage Currents.
- Published in:
- International Journal of Emerging Electric Power Systems, 2006, v. 5, n. 1, p. 1, doi. 10.2202/1553-779X.1111
- By:
- Publication type:
- Article
A Plan of Islanding Scheme for Pune City.
- Published in:
- International Journal of Emerging Electric Power Systems, 2006, v. 5, n. 1, p. 1, doi. 10.2202/1553-779X.1107
- By:
- Publication type:
- Article
Synergism of MW and Mvar Losses for Contingency Ranking Using Fuzzy Approach.
- Published in:
- International Journal of Emerging Electric Power Systems, 2006, v. 5, n. 1, p. 1, doi. 10.2202/1553-779X.1093
- By:
- Publication type:
- Article
Distribution Control Centre: Software Integration.
- Published in:
- International Journal of Emerging Electric Power Systems, 2006, v. 5, n. 1, p. 1, doi. 10.2202/1553-779X.1079
- By:
- Publication type:
- Article