Works matching IS 1471678X AND DT 2011 AND VI 22 AND IP 1
Results: 6
Supplier-led outsourcing: an intertemporal hierarchical framework.
- Published in:
- IMA Journal of Management Mathematics, 2011, v. 22, n. 1, p. 79, doi. 10.1093/imaman/dpq004
- By:
- Publication type:
- Article
Production inventory with service time and vacation to the server.
- Published in:
- IMA Journal of Management Mathematics, 2011, v. 22, n. 1, p. 33, doi. 10.1093/imaman/dpp025
- By:
- Publication type:
- Article
Optimal pricing, return and modular design policy for build-to-order (BTO) products in a two parties supply chain system.
- Published in:
- IMA Journal of Management Mathematics, 2011, v. 22, n. 1, p. 1, doi. 10.1093/imaman/dpp023
- By:
- Publication type:
- Article
An MX/G/1 energetic retrial queue with vacations and control.
- Published in:
- IMA Journal of Management Mathematics, 2011, v. 22, n. 1, p. 13, doi. 10.1093/imaman/dpp024
- By:
- Publication type:
- Article
Solving stochastic programming models in supply chain design using sampling heuristics.
- Published in:
- IMA Journal of Management Mathematics, 2011, v. 22, n. 1, p. 65
- By:
- Publication type:
- Article
Economic and economic-statistical design of a multivariate Bayesian control chart for condition-based maintenance.
- Published in:
- IMA Journal of Management Mathematics, 2011, v. 22, n. 1, p. 47, doi. 10.1093/imaman/dpp026
- By:
- Publication type:
- Article