Works matching IS 13923730 AND DT 2021 AND VI 27 AND IP 4
Results: 5
AN ANALYTIC NETWORK PROCESS BASED RISK ASSESSMENT MODEL FOR PPP HYDROPOWER INVESTMENTS.
- Published in:
- Journal of Civil Engineering & Management, 2021, v. 27, n. 4, p. 268, doi. 10.3846/jcem.2021.14650
- By:
- Publication type:
- Article
STUDY OF EMBODIED ENERGY IN HEALTHCARE CENTER CONSTRUCTION.
- Published in:
- Journal of Civil Engineering & Management, 2021, v. 27, n. 4, p. 260, doi. 10.3846/jcem.2021.14647
- By:
- Publication type:
- Article
BUSINESS STRATEGY DEVELOPMENT MODEL FOR APPLYING KNOWLEDGE MANAGEMENT IN CONSTRUCTION.
- Published in:
- Journal of Civil Engineering & Management, 2021, v. 27, n. 4, p. 246, doi. 10.3846/jcem.2021.14651
- By:
- Publication type:
- Article
COLLAPSE WARNING SYSTEM USING LSTM NEURAL NETWORKS FOR CONSTRUCTION DISASTER PREVENTION IN EXTREME WIND WEATHER.
- Published in:
- Journal of Civil Engineering & Management, 2021, v. 27, n. 4, p. 230, doi. 10.3846/jcem.2021.14649
- By:
- Publication type:
- Article
RELATIONAL CONTRACTING AND ITS COMBINATION WITH THE BIM METHODOLOGY IN MITIGATING ASYMMETRIC INFORMATION PROBLEMS IN CONSTRUCTION PROJECTS.
- Published in:
- Journal of Civil Engineering & Management, 2021, v. 27, n. 4, p. 217, doi. 10.3846/jcem.2021.14742
- By:
- Publication type:
- Article