Works matching IS 13923730 AND DT 2020 AND VI 26 AND IP 6
Results: 8
SCHEDULING OF REPETITIVE CONSTRUCTION PROCESSES WITH CONCURRENT WORK OF SIMILARLY SPECIALIZED CREWS.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 6, p. 579, doi. 10.3846/jcem.2020.12914
- By:
- Publication type:
- Article
SIMPLIFIED NEUTROSOPHIC INDETERMINATE DECISION MAKING METHOD WITH DECISION MAKERS' INDETERMINATE RANGES.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 6, p. 590, doi. 10.3846/jcem.2020.12919
- By:
- Publication type:
- Article
BEHAVIOUR OF HIGH-STRENGTH CONCRETE CIRCULAR COLUMNS CONFINED BY HIGH-STRENGTH SPIRALS UNDER CONCENTRIC COMPRESSION.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 6, p. 564, doi. 10.3846/jcem.2020.12913
- By:
- Publication type:
- Article
CONCEPTUALISING BUILDING INFORMATION MODELLING FOR CONSTRUCTION EDUCATION.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 6, p. 551, doi. 10.3846/jcem.2020.12918
- By:
- Publication type:
- Article
THE WILLINGNESS TO ADOPT THE INTERNET OF THINGS (IoT) CONCEPTION IN TAIWAN'S CONSTRUCTION INDUSTRY.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 6, p. 534, doi. 10.3846/jcem.2020.12639
- By:
- Publication type:
- Article
INTERPRETIVE STRUCTURAL MODELING IN EARNED VALUE MANAGEMENT.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 6, p. 524, doi. 10.3846/jcem.2020.12182
- By:
- Publication type:
- Article
USE OF BIM WITH PHOTOGRAMMETRY SUPPORT IN SMALL CONSTRUCTION PROJECTS. CASE STUDY FOR COMMERCIAL FRANCHISES.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 6, p. 513, doi. 10.3846/jcem.2020.12611
- By:
- Publication type:
- Article
MODEL TO REDUCE EARTHMOVING IMPACTS.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 6, p. 490, doi. 10.3846/jcem.2020.12641
- By:
- Publication type:
- Article