Works matching IS 13923730 AND DT 2020 AND VI 26 AND IP 4
Results: 6
PROPOSED PROCEDURE FOR OPTIMAL MAINTENANCE SCHEDULING UNDER EMERGENT FAILURES.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 4, p. 396, doi. 10.3846/jcem.2020.12315
- By:
- Publication type:
- Article
SAFETY RISK EVALUATIONS OF DEEP FOUNDATION CONSTRUCTION SCHEMES BASED ON IMBALANCED DATA SETS.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 4, p. 380, doi. 10.3846/jcem.2020.12321
- By:
- Publication type:
- Article
DEVELOPMENT OF AN ADVANCED COMPOSITE SYSTEM FORM FOR CONSTRUCTABILITY IMPROVEMENT THROUGH A DESIGN FOR SIX SIGMA PROCESS.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 4, p. 364, doi. 10.3846/jcem.2020.12188
- By:
- Publication type:
- Article
SCIENTOMETRIC REVIEW OF CONSTRUCTION PROJECT SCHEDULE STUDIES: TRENDS, GAPS AND POTENTIAL RESEARCH AREAS.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 4, p. 343, doi. 10.3846/jcem.2020.12317
- By:
- Publication type:
- Article
A MODEL FOR EVALUATING CAUSES OF WASTES AND LEAN IMPLEMENTATION IN CONSTRUCTION PROJECTS.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 4, p. 331, doi. 10.3846/jcem.2020.12323
- By:
- Publication type:
- Article
AN ASSOCIATION RULE MINING MODEL FOR THE ASSESSMENT OF THE CORRELATIONS BETWEEN THE ATTRIBUTES OF SEVERE ACCIDENTS.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 4, p. 315, doi. 10.3846/jcem.2020.12316
- By:
- Publication type:
- Article