Works matching IS 13811231 AND DT 2009 AND VI 15 AND IP 1
Results: 4
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint.
- Published in:
- Journal of Heuristics, 2009, v. 15, n. 1, p. 19, doi. 10.1007/s10732-007-9061-z
- By:
- Publication type:
- Article
Approximate solution of a resource-constrained scheduling problem.
- Published in:
- Journal of Heuristics, 2009, v. 15, n. 1, p. 1, doi. 10.1007/s10732-007-9052-0
- By:
- Publication type:
- Article
On the efficiency of evolutionary fuzzy clustering.
- Published in:
- Journal of Heuristics, 2009, v. 15, n. 1, p. 43, doi. 10.1007/s10732-007-9059-6
- By:
- Publication type:
- Article
Efficient tree traversal to reduce code growth in tree-based genetic programming.
- Published in:
- Journal of Heuristics, 2009, v. 15, n. 1, p. 77, doi. 10.1007/s10732-007-9060-0
- By:
- Publication type:
- Article