Works matching IS 11749857 AND DT 2023 AND VI 56 AND IP 2
Results: 5
POST-EARTHQUAKE BUILDING ASSESSMENTS: HOW LONG DO THEY TAKE?
- Published in:
- Bulletin of the New Zealand Society for Earthquake Engineering, 2023, v. 56, n. 2, p. 115, doi. 10.5459/bnzsee.1568
- By:
- Publication type:
- Article
ASSESSMENT OF THE TORSIONAL BEHAVIOR OF HOLLOW-CORE SLABS.
- Published in:
- Bulletin of the New Zealand Society for Earthquake Engineering, 2023, v. 56, n. 2, p. 104, doi. 10.5459/bnzsee.1572
- By:
- Publication type:
- Article
REVIEW OF RECENTLY CONSTRUCTED CONCRETE WALL-STEEL FRAME HYBRID BUILDINGS.
- Published in:
- Bulletin of the New Zealand Society for Earthquake Engineering, 2023, v. 56, n. 2, p. 91, doi. 10.5459/bnzsee.1602
- By:
- Publication type:
- Article
PERFORMANCE OF ROCKING FRAMES WITH FRICTION TENSION-ONLY DEVICES.
- Published in:
- Bulletin of the New Zealand Society for Earthquake Engineering, 2023, v. 56, n. 2, p. 71, doi. 10.5459/bnzsee.1583
- By:
- Publication type:
- Article
SEISMIC ACTIVITY ANALYSIS OF FIVE MAJOR EARTHQUAKE SOURCE SEGMENTS IN THE SUMATRA MEGATHRUST ZONE: EACH SEGMENT AND TWO ADJACENT SEGMENTS POINTS OF VIEW.
- Published in:
- Bulletin of the New Zealand Society for Earthquake Engineering, 2023, v. 56, n. 2, p. 55, doi. 10.5459/bnzsee.1555
- By:
- Publication type:
- Article