Works matching IS 10946136 AND DT 2024 AND VI 27 AND IP 6
Results: 6
Scheduling a single machine with multiple due dates per job.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 6, p. 565, doi. 10.1007/s10951-024-00825-w
- By:
- Publication type:
- Article
Network routing on regular digraphs and their line graphs.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 6, p. 557, doi. 10.1007/s10951-024-00823-y
- By:
- Publication type:
- Article
Resource leveling: complexity of a unit execution time two-processor scheduling variant and related problems.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 6, p. 587, doi. 10.1007/s10951-024-00822-z
- By:
- Publication type:
- Article
Investigating constraint programming and hybrid methods for real world industrial test laboratory scheduling.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 6, p. 607, doi. 10.1007/s10951-024-00821-0
- By:
- Publication type:
- Article
Serial batching to minimize the weighted number of tardy jobs.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 6, p. 545, doi. 10.1007/s10951-024-00818-9
- By:
- Publication type:
- Article
Minimizing the earliness–tardiness for the customer order scheduling problem in a dedicated machine environment.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 6, p. 525, doi. 10.1007/s10951-024-00814-z
- By:
- Publication type:
- Article