Works matching IS 10946136 AND DT 2024 AND VI 27 AND IP 3
Results: 7
Scheduling with periodic availability constraints to minimize makespan.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 3, p. 277, doi. 10.1007/s10951-023-00790-w
- By:
- Publication type:
- Article
Mixed-model moving assembly line material placement optimization for a shorter time-dependent worker walking time.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 3, p. 257, doi. 10.1007/s10951-023-00787-5
- By:
- Publication type:
- Article
Dynamic scheduling problems in theory and practice.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 3, p. 225, doi. 10.1007/s10951-023-00798-2
- By:
- Publication type:
- Article
Single-machine primary–secondary scheduling with total tardiness being the primary criterion.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 3, p. 309, doi. 10.1007/s10951-023-00793-7
- By:
- Publication type:
- Article
Improving scheduling in multi-AGV systems by task prediction.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 3, p. 299, doi. 10.1007/s10951-023-00792-8
- By:
- Publication type:
- Article
Exact algorithms and approximation schemes for proportionate flow shop scheduling with step-deteriorating processing times.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 3, p. 239, doi. 10.1007/s10951-022-00766-2
- By:
- Publication type:
- Article
Single machine scheduling with step-learning.
- Published in:
- Journal of Scheduling, 2024, v. 27, n. 3, p. 227, doi. 10.1007/s10951-022-00763-5
- By:
- Publication type:
- Article