Works matching IS 10946136 AND DT 2021 AND VI 24 AND IP 3
Results: 6
Makespan minimization with OR-precedence constraints.
- Published in:
- Journal of Scheduling, 2021, v. 24, n. 3, p. 319, doi. 10.1007/s10951-021-00687-6
- By:
- Publication type:
- Article
Quantifying and enforcing robustness in staff rostering.
- Published in:
- Journal of Scheduling, 2021, v. 24, n. 3, p. 347, doi. 10.1007/s10951-021-00686-7
- By:
- Publication type:
- Article
Scheduling for multi-robot routing with blocking and enabling constraints.
- Published in:
- Journal of Scheduling, 2021, v. 24, n. 3, p. 291, doi. 10.1007/s10951-021-00684-9
- By:
- Publication type:
- Article
A hybrid evolutionary approach to job-shop scheduling with generic time lags.
- Published in:
- Journal of Scheduling, 2021, v. 24, n. 3, p. 329, doi. 10.1007/s10951-021-00683-w
- By:
- Publication type:
- Article
Solving the nuclear dismantling project scheduling problem by combining mixed-integer and constraint programming techniques and metaheuristics.
- Published in:
- Journal of Scheduling, 2021, v. 24, n. 3, p. 269, doi. 10.1007/s10951-021-00682-x
- By:
- Publication type:
- Article
A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource.
- Published in:
- Journal of Scheduling, 2021, v. 24, n. 3, p. 259, doi. 10.1007/s10951-021-00681-y
- By:
- Publication type:
- Article