Works matching IS 10946136 AND DT 2020 AND VI 23 AND IP 3
Results: 7
Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling.
- Published in:
- Journal of Scheduling, 2020, v. 23, n. 3, p. 301, doi. 10.1007/s10951-020-00651-w
- By:
- Publication type:
- Article
Single machine scheduling to maximize the number of on-time jobs with generalized due-dates.
- Published in:
- Journal of Scheduling, 2020, v. 23, n. 3, p. 289, doi. 10.1007/s10951-020-00638-7
- By:
- Publication type:
- Article
Evaluating periodic rescheduling policies using a rolling horizon framework in an industrial-scale multipurpose plant.
- Published in:
- Journal of Scheduling, 2020, v. 23, n. 3, p. 397, doi. 10.1007/s10951-019-00627-5
- By:
- Publication type:
- Article
The optimal design of round-robin tournaments with three players.
- Published in:
- Journal of Scheduling, 2020, v. 23, n. 3, p. 379, doi. 10.1007/s10951-019-00624-8
- By:
- Publication type:
- Article
Branch-cut-and-price for scheduling deliveries with time windows in a direct shipping network.
- Published in:
- Journal of Scheduling, 2020, v. 23, n. 3, p. 363, doi. 10.1007/s10951-019-00620-y
- By:
- Publication type:
- Article
Optimizing the physician scheduling problem in a large hospital ward.
- Published in:
- Journal of Scheduling, 2020, v. 23, n. 3, p. 337, doi. 10.1007/s10951-019-00614-w
- By:
- Publication type:
- Article
Two-machine flow shops with an optimal permutation schedule under a storage constraint.
- Published in:
- Journal of Scheduling, 2020, v. 23, n. 3, p. 327, doi. 10.1007/s10951-019-00608-8
- By:
- Publication type:
- Article