Works matching IS 10946136 AND DT 2018 AND VI 21 AND IP 5
Results: 7
Rescheduling due to machine disruption to minimize the total weighted completion time.
- Published in:
- Journal of Scheduling, 2018, v. 21, n. 5, p. 565, doi. 10.1007/s10951-018-0575-z
- By:
- Publication type:
- Article
A new algorithm based on evolutionary computation for hierarchically coupled constraint optimization: methodology and application to assembly job-shop scheduling.
- Published in:
- Journal of Scheduling, 2018, v. 21, n. 5, p. 545, doi. 10.1007/s10951-018-0572-2
- By:
- Publication type:
- Article
Admission control in shared memory switches.
- Published in:
- Journal of Scheduling, 2018, v. 21, n. 5, p. 533, doi. 10.1007/s10951-018-0564-2
- By:
- Publication type:
- Article
A two-stage stochastic program for multi-shift, multi-analyst, workforce optimization with multiple on-call options.
- Published in:
- Journal of Scheduling, 2018, v. 21, n. 5, p. 517, doi. 10.1007/s10951-017-0554-9
- By:
- Publication type:
- Article
Models and algorithms for energy-efficient scheduling with immediate start of jobs.
- Published in:
- Journal of Scheduling, 2018, v. 21, n. 5, p. 505, doi. 10.1007/s10951-017-0552-y
- By:
- Publication type:
- Article
Scheduling meets n-fold integer programming.
- Published in:
- Journal of Scheduling, 2018, v. 21, n. 5, p. 493, doi. 10.1007/s10951-017-0550-0
- By:
- Publication type:
- Article
An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines.
- Published in:
- Journal of Scheduling, 2018, v. 21, n. 5, p. 483, doi. 10.1007/s10951-017-0546-9
- By:
- Publication type:
- Article