Works matching IS 10946136 AND DT 2016 AND VI 19 AND IP 5
Results: 7
Scheduling parallel-machine batch operations to maximize on-time delivery performance.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 5, p. 583, doi. 10.1007/s10951-015-0449-6
- By:
- Publication type:
- Article
Worst-case performance analysis of some approximation algorithms for minimizing makespan and flowtime.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 5, p. 547, doi. 10.1007/s10951-015-0467-4
- By:
- Publication type:
- Article
An analysis of the non-preemptive mixed-criticality match-up scheduling problem.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 5, p. 601, doi. 10.1007/s10951-016-0468-y
- By:
- Publication type:
- Article
High-multiplicity scheduling on one machine with forbidden start and completion times.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 5, p. 609, doi. 10.1007/s10951-016-0475-z
- By:
- Publication type:
- Article
Finding optimal tour schedules on transportation paths under extended time window constraints.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 5, p. 527, doi. 10.1007/s10951-016-0481-1
- By:
- Publication type:
- Article
Scheduling operating rooms: achievements, challenges and pitfalls.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 5, p. 493, doi. 10.1007/s10951-016-0489-6
- By:
- Publication type:
- Article
A reclaimer scheduling problem arising in coal stockyard management.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 5, p. 563, doi. 10.1007/s10951-015-0436-y
- By:
- Publication type:
- Article