Works matching IS 10946136 AND DT 2016 AND VI 19 AND IP 2
Results: 7
An exact algorithm for an integrated project staffing problem with a homogeneous workforce.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 2, p. 107, doi. 10.1007/s10951-015-0443-z
- By:
- Publication type:
- Article
Single machine scheduling problems with uncertain parameters and the OWA criterion.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 2, p. 177, doi. 10.1007/s10951-015-0444-y
- By:
- Publication type:
- Article
Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 2, p. 165, doi. 10.1007/s10951-015-0448-7
- By:
- Publication type:
- Article
Measuring the impact of adversarial errors on packet scheduling strategies.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 2, p. 135, doi. 10.1007/s10951-015-0451-z
- By:
- Publication type:
- Article
A note on longest processing time algorithms for the two uniform parallel machine makespan minimization problem.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 2, p. 207, doi. 10.1007/s10951-015-0453-x
- By:
- Publication type:
- Article
Relocation scheduling subject to fixed processing sequences.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 2, p. 153, doi. 10.1007/s10951-015-0455-8
- By:
- Publication type:
- Article
Ant colony systems for the single-machine total weighted earliness tardiness scheduling problem.
- Published in:
- Journal of Scheduling, 2016, v. 19, n. 2, p. 191, doi. 10.1007/s10951-015-0429-x
- By:
- Publication type:
- Article