Works matching IS 10946136 AND DT 2015 AND VI 18 AND IP 3
Results: 12
Trading off due-date tightness and job tardiness in a basic scheduling model.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 305, doi. 10.1007/s10951-014-0394-9
- By:
- Publication type:
- Article
A note on the preemptive scheduling to minimize total completion time with release time and deadline constraints.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 315, doi. 10.1007/s10951-014-0368-y
- By:
- Publication type:
- Article
Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 285, doi. 10.1007/s10951-014-0374-0
- By:
- Publication type:
- Article
A note on $${\mathbb {NP}}$$ -hardness of preemptive mean flow-time scheduling for parallel machines.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 299, doi. 10.1007/s10951-014-0380-2
- By:
- Publication type:
- Article
The impact of core precedences in a cyclic RCPSP with precedence delays.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 275, doi. 10.1007/s10951-014-0399-4
- By:
- Publication type:
- Article
Energetic reasoning for energy-constrained scheduling with a continuous resource.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 225, doi. 10.1007/s10951-014-0404-y
- By:
- Publication type:
- Article
Scheduling two agent task chains with a central selection mechanism.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 243, doi. 10.1007/s10951-014-0414-9
- By:
- Publication type:
- Article
Erratum to: A survey on offline scheduling with rejection.
- Published in:
- 2015
- By:
- Publication type:
- Erratum
A note on the Coffman-Sethi bound for LPT scheduling.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 325, doi. 10.1007/s10951-015-0419-z
- By:
- Publication type:
- Article
Erratum to: Flow shops with WIP and value added costs.
- Published in:
- 2015
- By:
- Publication type:
- Erratum
Minimizing the expected makespan of a project with stochastic activity durations under resource constraints.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 263, doi. 10.1007/s10951-015-0421-5
- By:
- Publication type:
- Article
A cyclical search for the two machine flow shop and open shop to minimise finishing time.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 3, p. 311, doi. 10.1007/s10951-013-0356-7
- By:
- Publication type:
- Article