Works matching IS 10946136 AND DT 2011 AND VI 14 AND IP 4
Results: 7
An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags.
- Published in:
- Journal of Scheduling, 2011, v. 14, n. 4, p. 391, doi. 10.1007/s10951-009-0125-9
- By:
- Publication type:
- Article
A polynomial-time algorithm for a flow-shop batching problem with equal-length operations.
- Published in:
- Journal of Scheduling, 2011, v. 14, n. 4, p. 371, doi. 10.1007/s10951-009-0150-8
- By:
- Publication type:
- Article
Minimizing the number of late jobs on a single machine under due date uncertainty.
- Published in:
- Journal of Scheduling, 2011, v. 14, n. 4, p. 351, doi. 10.1007/s10951-010-0183-z
- By:
- Publication type:
- Article
A new model for the integrated vehicle-crew-rostering problem and a computational study on rosters.
- Published in:
- Journal of Scheduling, 2011, v. 14, n. 4, p. 319, doi. 10.1007/s10951-010-0195-8
- By:
- Publication type:
- Article
A set partitioning reformulation of a school bus scheduling problem.
- Published in:
- Journal of Scheduling, 2011, v. 14, n. 4, p. 307, doi. 10.1007/s10951-011-0234-0
- By:
- Publication type:
- Article
A best online algorithm for unbounded parallel-batch scheduling with restarts to minimize makespan.
- Published in:
- Journal of Scheduling, 2011, v. 14, n. 4, p. 361, doi. 10.1007/s10951-010-0172-2
- By:
- Publication type:
- Article
Scheduling unit length jobs on parallel machines with lookahead information.
- Published in:
- Journal of Scheduling, 2011, v. 14, n. 4, p. 335, doi. 10.1007/s10951-010-0192-y
- By:
- Publication type:
- Article