Works matching IS 10946136 AND DT 2008 AND VI 11 AND IP 2
Results: 5
Time-constrained project scheduling.
- Published in:
- Journal of Scheduling, 2008, v. 11, n. 2, p. 137, doi. 10.1007/s10951-008-0059-7
- By:
- Publication type:
- Article
A heuristic method for the vehicle routing problem with mixed deliveries and pickups.
- Published in:
- Journal of Scheduling, 2008, v. 11, n. 2, p. 149, doi. 10.1007/s10951-008-0055-y
- By:
- Publication type:
- Article
A dynamic programming algorithm for days-off scheduling with sequence dependent labor costs.
- Published in:
- Journal of Scheduling, 2008, v. 11, n. 2, p. 85, doi. 10.1007/s10951-007-0040-x
- By:
- Publication type:
- Article
Optimal scheduling of peer-to-peer file dissemination.
- Published in:
- Journal of Scheduling, 2008, v. 11, n. 2, p. 105, doi. 10.1007/s10951-007-0017-9
- By:
- Publication type:
- Article
Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities.
- Published in:
- Journal of Scheduling, 2008, v. 11, n. 2, p. 121, doi. 10.1007/s10951-007-0021-0
- By:
- Publication type:
- Article